HVAC (new furnace and dual zone added)
Project Description
- Zone the furnace for the main floor on one zone and the basement on the second zone (Dampers, and Controls as required)
- Add new ducting for basement zone
- New Supply Hot Airs to ceiling in the basement (3x10)
- New Cold air Returns down walls to the floor (as required and where applicable)
- Vent two 4" bath fans, one in bathroom/ one in laundry room (Fans supplied by us, electrical by others and timer control for laundry fan by others)
- Vent 4" dryer vent
- City of Calgary HVAC Permit
- Once renovation is complete we will return to install registers and grills (Both Plastic)
Download Project documents