Project Express Get Quotes & find Service Providers easily!

Project Overview

  • Location:
  • Budget:
    negotiable
  • Job type:
    Contract
  • Posted:
    7 years ago
  • Category:
    HVAC
  • Deadline:
    August 27, 2018

HVAC (new furnace and dual zone added)

Project Description

  1. Zone the furnace for the main floor on one zone and the basement on the second zone (Dampers, and Controls as required)
  2. Add new ducting for basement zone
  3. New Supply Hot Airs to ceiling in the basement (3x10)
  4. New Cold air Returns down walls to the floor (as required and where applicable)
  5. Vent two 4" bath fans, one in bathroom/ one in laundry room (Fans supplied by us, electrical by others and timer control for laundry fan by others)
  6. Vent 4" dryer vent
  7. City of Calgary HVAC Permit
  8. Once renovation is complete we will return to install registers and grills (Both Plastic)

Download Project documents

location