Home improvement

Planning home improvement that is worth the disruption

Living through construction is expensive in ways money does not capture. Sequence matters.

Back to the blog

Most advice about home improvement is about individual projects. The harder question is which to do, in what order, and which to leave alone — because you pay for every project twice, once in money and once in disruption.

Fix what is failing before improving what is not

Unglamorous and almost always right. A roof leak, failing drainage, an electrical panel at capacity, a slow plumbing leak — these get worse and take other things with them.

A beautiful kitchen under a roof that leaks is a kitchen with a deadline. Water damage is the most expensive category of home repair precisely because it destroys things that were fine.

Do the disruptive things together

If two projects both mean opening the same wall, being without the same room, or having a crew in the same space, doing them together costs less than twice one and disrupts far less.

Rewiring a room and replastering it is one project. Done separately it is two, and the second undoes some of the first.

Before starting anything that opens a wall or a floor, ask what else you would want done in that space in the next five years. That is the cheapest moment it will ever be.

Sequence from the outside in and the top down

Roof and envelope before interior finishes. Rough systems before surfaces. Dusty work before clean work.

This sounds obvious and gets violated constantly, usually because the exciting project is the visible one. New floors installed before the roof is fixed is a familiar and expensive mistake.

Count the cost of living through it

Being without a kitchen for six weeks has a real cost: eating out, stress, time. It rarely appears in a budget and it is often what people regret.

This argues for fewer, bigger projects rather than a rolling series of small ones. A house permanently mid-renovation is exhausting in a way that a single hard month is not.

Be honest about how long you are staying

Changes the calculation entirely. Staying twenty years, build for yourself and for durability. Selling in two, the question is narrower: what will a buyer notice and what will show up on an inspection?

Deferred maintenance and permit problems hurt at sale. Highly personal taste rarely returns what it costs.

Permits are not optional and not the enemy

Structural changes, most electrical and plumbing alterations, and anything affecting egress or the building envelope generally need one. Your local building department can tell you.

Unpermitted work surfaces at the worst times: at sale, at an insurance claim, or when a neighbour complains. It can have to be opened for inspection or removed.

When to leave it alone

Some things are worth not doing. Work whose payback is longer than you will be there. Cosmetic changes to something structurally suspect — you are decorating a problem. Anything you are only considering because a contractor suggested it while doing something else.

"While we're in there" is sometimes genuinely sensible and sometimes a project you never chose, priced under time pressure.

A workable order for most houses

  • Anything actively failing or letting water in.
  • Systems at or past end of life, particularly electrical and plumbing.
  • Structural work, which dictates everything after it.
  • Rough work in the rooms you will finish.
  • Finishes, which are what you actually wanted.
  • Cosmetic and outdoor work, which can wait and which you can often do yourself.

Most people want to start at the bottom of that list, which is human and is also why so many renovations get redone.