Remove old shower and tiles. Construct new shower area (extend and widen) in master bathroom. Include bench and nook area. Add 3 body jets and new fixtures. Add glass shower enclosure. Plumb in shower and tub. Wire in Air tub. Tile in shower, floor and around bathtub. Tile cabinet toe kick and baseboard.
Remove existing shower tiles and sheet flooring. Tile main bathroom floor and tub/shower area and toilet area. Tile cabinet toe kick and baseboard.
Remove existing flooring. Tile floor and small area around tub surround in basement bathroom. Tile cabinet toe kick and baseboard.
Remove sheet flooring. Tile floor in basement 1/2 bathroom. Tile cabinet toe kick and baseboard.
Dispose of garbage/debris.